(33E) Stream Flow Estimate in Culverts
|
03-10-2019, 01:53 PM
(This post was last modified: 03-10-2019 04:19 PM by Dieter.)
Post: #8
|
|||
|
|||
RE: (33E) Stream Flow Estimate in Culverts
(03-09-2019 09:04 PM)Thomas Klemm Wrote:Quote:BTW the conversion constant actually is 0,3048–1/3 = 1,4859... We can even use the exact value. ;-) Sometimes you overlook the obvious: since the exact value is a cube root it can be factored into the one that is already calculated. Code: 01 RAD For d=3,5 this yields a flow rate of 208,66 ft³/s. And finally there is even one unused step left. Add your preferred display format if you like. For metric units (input in m, output in m², m/s and m³/s) simply remove line 29...34. Dieter |
|||
« Next Oldest | Next Newest »
|
Messages In This Thread |
(33E) Stream Flow Estimate in Culverts - SlideRule - 03-08-2019, 01:14 PM
RE: (33E) Stream Flow Estimate in Culverts - PedroLeiva - 03-09-2019, 04:32 AM
RE: (33E) Stream Flow Estimate in Culverts - Dieter - 03-09-2019, 06:57 PM
RE: (33E) Stream Flow Estimate in Culverts - Thomas Klemm - 03-09-2019, 09:04 PM
RE: (33E) Stream Flow Estimate in Culverts - Dieter - 03-09-2019, 09:21 PM
RE: (33E) Stream Flow Estimate in Culverts - Dieter - 03-10-2019 01:53 PM
RE: (33E) Stream Flow Estimate in Culverts - Dieter - 03-10-2019, 07:53 PM
RE: (33E) Stream Flow Estimate in Culverts - Thomas Klemm - 03-09-2019, 10:30 PM
RE: (33E) Stream Flow Estimate in Culverts - Dieter - 03-10-2019, 10:03 AM
RE: (33E) Stream Flow Estimate in Culverts - Thomas Klemm - 03-10-2019, 10:19 PM
RE: (33E) Stream Flow Estimate in Culverts - Dieter - 03-11-2019, 09:58 AM
|
User(s) browsing this thread: 7 Guest(s)