Post Reply 
(34S) Integration (using the double-exponential method)
03-27-2017, 12:09 AM
Post: #12
RE: (WP-34S) Integration (using the double-exponential method)
(03-26-2017 06:34 PM)emece67 Wrote:  Corrupts ABCD with some unknown data (no matter if the user is in SSIZE4 or SSIZE8, ABCD are always corrupted)

I'm not seeing corruption here in SSIZE4 mode. In SSIZE8 mode, the values are whatever is left from the final function evaluation.


Pauli
Find all posts by this user
Quote this message in a reply
Post Reply 


Messages In This Thread
RE: (WP-34S) Integration (using the double-exponential method) - Paul Dale - 03-27-2017 12:09 AM



User(s) browsing this thread: 4 Guest(s)